The bottleneck may sit beyond the model
Imagine a Philippine sales operation using AI to process a day’s incoming inquiries. The model classifies them quickly, but the CRM accepts updates more slowly. Adding more parallel assistants could make the waiting line worse while giving the impression that more capacity has been added. This is a hypothetical operating scenario, not a reported client result.
Kooya recommends drawing the whole path: model requests, document reads, CRM writes and notifications. Give each dependency an explicit capacity policy. A healthy model endpoint does not establish that the rest of the workflow can absorb the same burst.
Read the service response before choosing the delay
Microsoft Graph documents HTTP 429 responses for throttling and advises honoring Retry-After where supplied. Its guidance recommends exponential backoff when that header is absent. It also notes that requests within a JSON batch can be throttled individually even when the overall batch returns HTTP 200.[1]
Those are Microsoft Graph behaviours, not a promise that every API uses the same rules. Read the contract of each connected service. Preserve the original status and request identifier so an operator can distinguish throttling from expired access, malformed input or a failed business validation. Retrying all of those in the same way conceals the real problem.
Decide what is allowed into the waiting queue
A queue should not become an invisible storage area for work whose deadline has already passed. Record when the task arrived, when it becomes eligible to retry and when it stops being useful. If the backlog cannot be completed within the agreed window, tell the receiving team before the system starts making promises it cannot keep.
Kooya’s suggested policy separates urgent service work from discretionary background analysis. Reserve capacity deliberately and prevent an unusually large customer request from blocking every other user. The exact limits depend on the application and provider terms; there is no universal safe concurrency setting.
Make waiting, failed and completed different states
An operator needs to know whether a task has not started, is waiting for capacity, needs attention or has actually finished. Avoid a single spinner that covers all four states. Show the age of the oldest waiting task and the next decision the person can take, such as cancel, reschedule or escalate.
For actions that may have already reached a destination, verify their outcome before replaying them. Capacity recovery does not answer whether a previous write succeeded. Keep the record of the intended action and its business identifier so retry controls can prevent accidental repetition.
Test the recovery, not just the refusal
Use a controlled test to slow one dependency while other parts of the workflow remain available. Verify that the queue stays bounded, deadlines are respected and the interface explains the delay. Then restore capacity and observe whether the system resumes gradually or produces another burst of failures.
The acceptance evidence should include queued work, expired work, completed outcomes and exceptions requiring a person. A provider returning to normal is only the start of recovery. The business is recovered when the waiting work has been resolved and nobody is mistaking an old pending task for a current commitment.
Pair queue recovery with controls that prevent duplicate actions after a retry.

